ITM

Scroll / Drag

1

introduction

4-100

The technological progress,
the essential  value of the
human experience.

"

LEFT
Above
A part of the track
ready to be assembled.
NO.
23
the workflow
12
A worker welding
the steel.
NO.
12
4-101
4-102
left
Above
Small iron rings
for the the track.
NO.
13

T o tell the complexity of this project, in several days of scout locations we identified the most spectacular spots. The shooting lasted two weeks, we visited five different production sites in Italy and Spain.